It was amazing to be shown around the iconic Blast Furnace No 5 at Tata Steel. Vital repair work to extend the life of the blast was being carried out by a dedicated team, so there was a short window of opportunity to go inside the blast furnace and see the  fascinating work that was being done. The work is incredibly complex and difficult but it’s crucial work which will make such a difference to the steelworks. This £46 million investment is critical for the future of the works and for Aberavon.

Link to Instagram Link to Twitter Link to YouTube Link to Facebook Link to LinkedIn Link to Snapchat Close Fax Website Location Phone Email Calendar Building Search